Berth 164 MOTEMS Compliance
Berth 164 MOTEMS Compliance
Challenge:

The Berth 164 structural system was previously evaluated by POLA and their consultants as a "high risk" facility and was found to be inadequate considering MOTEMS requirements for berthing loads and Level 2 seismic loads. The purpose of this analysis is to re-evaluate the existing Berth 164 system for the "medium risk" criteria. If the Berth 164 system is found to be inadequate for the medium risk criteria, then structural design modifications will be recommended.

Resolution:

Under MOTEMS criteria, the existing berthing and mooring systems are adequate. Structurally, for the "medium risk" seismic criteria the Berth 164 wharf will need the following modifications:

HEA has completed numerous jobs similar to the one shown above (Similar Projects)