December 2014 Project:
Coker Elevator Replacement
Challenge:
An existing passenger elevator in the Coker unit of a local refinery is becoming increasingly unreliable due to age and limited availability of replacement parts. A new elevator is to be installed at the unit. Consideration is given to limit impact to operations during construction, minimize necessary structural upgrades and expedite the permitting process while maintaining a tight budget.
Resolution:
Engineering and project management support were provided during option
brainstorming, bid package preparation, bid analysis and vendor selection. As a
temporary construction elevator is required to allow operations to continue during the
new permanent elevator installation, the existing structure was analyzed for both the
temporary and permanent elevator loads. Effort was made to minimize the structural
modifications required by working with the elevator vendor as they designed the
connection to the existing structure. The structural modification design was guided
through the City of Los Angeles Plan Check process and permits were obtained in a timely
manner.
Installation of the new elevator is scheduled in the near future.